Hoa Binh Industrial Park

(0) 0 Reviews 0 Orders 0 Wish listed
$0.00
Quantity :
Total price :
  (Tax : )
Out of stock

HOA BINH INDUSTRIAL PARK

Advantage:

  • 500m from National Highway 1A
  • 35 km from Tan Son Nhat Airport (about 65 minutes drive)
  • Available land, factory can be built immediately
  • Complete and synchronous technical infrastructure

General information:

  • Total area: 117.67 hectares
  • Leaseable area: 80% of total area
  • Project location: in Nhi Thanh Commune, Thu Thua District, Long An Province
  • North: adjacent to DT818 - road connecting National Highway 1A to Thu Thua town (350m)
  • South: adjacent to Nam Buong canal and rice fields
  • West: adjacent to the new canal and the existing residential area
  • East: adjacent to the residential area and worker housing of Hoa Binh industrial park and Chin Duoc canal

Land allocation:

No Type Area (ha) Rate (%)
1 Factory land 86.18 73.24
2 Technical zones 1.58 1.34
3 Administrative buildings 1.96 1.66
4 Traffic land 12.39 10.53
5 Green land, surface water 15.56 13.23
6 Total 117.67 100.00

Rental price and payment method

  • Land rental price: Contact
  • Payment method: Payment in 6 phases as follows:
  1. Phase 1: 10% when signing the Land Retention Agreement
  2. Phase 2: 25% after signing the Land Lease Contract (01 month after phase 1)
  3. Phase 3: 20% 1 month after signing the land contract
  4. Phase 4: 20% 2 months after signing the land contract
  5. Phase 5: 20% 4 months after signing the land contract
  6. Phase 6: 5% after notification of receipt of Certificate of Land Use Rights (LUR)
  • Infrastructure maintenance fee: 900 VND/m2/month (~0.039USD/m2/month). Calculated on the entire leased land area and paid quarterly on the 25th day of the last month of the quarter.
  • Lease term: until September 10, 2058.

Infrastructure

  • Infrastructure: road systems, electricity supply, water supply, and communications are built/installed to the boundary of each land plot.
  • Power supply system:
  • Supplied from the national grid through Thu Thua power station (110kV/22 kV-2x25MVA)
  • Electricity price: according to the price announced by the Vietnam Electricity Group (EVN)
  • Customers will sign an electricity purchase contract directly with EVN. For customers renting factories, customers will sign a contract with HBI and the unit price will be surcharged 10% on the unit price announced by EVN.

Contact Hoa Binh Infrastructure for further information and advice!

No review given yet!

Fast Delivery all across the country
Safe Payment
7 Days Return Policy
100% Authentic Products
More from the store
Infrastructure Construction
$0.00
Two-Storey Factory
$0.00
Ready-Built Factory
$0.00
Dai Nghia 1 Industrial Cluster
$0.00
Total price :
  (Tax : )
Top